Entry01
Facility
Feasibility and infrastructure studies for production, maintenance and test facilities
The location, layout and surroundings of production, maintenance and test facilities are considered together. Needs such as power, water, access and workshop floors are put on the table in the first stage of the feasibility study. An investment decision then does not rest on a missing assumption. The findings are written into the report in plain language.
Questions we look at
- Site and access: where can the facility be built and how is it reached?
- Infrastructure: how are the needs for power, water and ground met?
- Layout and flow: by which route do work and materials move through the facility?